Purva Silversky, Electronic City Phase 2: Buyer's Guide (October 2026)

Puravankara is building Purva Silversky in Hebbagodi, a South Bangalore pocket off Huskur Road within Electronic City Phase 2. Some 356 homes are planned across three towers rising 32 floors, nearly all with three or four bedrooms. Below are the location, the home mix, the RERA record, prices, the buyer it fits and what to check first.
Where the Project Is
Land records list survey numbers 60/16, 59/3 and 58/1, in Anekal Taluk's Attibele Hobli, Hebbagodi village (pincode 560099). A road borders the plot on the east. A KSIDC industrial area and the edge of Veerasandra village adjoin the west, while private holdings flank the north and south.
Namma Metro's Yellow Line, linking RV Road and Bommasandra, opened in August 2025, with stations at Hebbagodi and Huskur Road close to this part of Hebbagodi. Cars head to Silk Board over the elevated expressway or Hosur Road. NICE Road connects the area with Tumkur Road and Mysore Road.
Typical drive times in normal traffic:
- 3 minutes to St. Francis de Sales Public School
- 4 minutes to M5 Ecity Mall
- 8 minutes to PES University, Electronic City
- 9 minutes to Tata Consultancy Services
- 12 minutes to Narayana Institute of Cardiac Sciences
- 13 minutes to the Infosys campus
- 18 minutes to the Wipro campus
Three Towers, Mostly Large Homes
Each of Towers A, B and C has a basement, a stilt floor and 32 storeys reaching roughly 108 metres, spread over 6.99 acres. There are 118 homes in A, 118 in B and 120 in C, a density near 51 homes per acre. With four flats on most floors, lift lobbies stay compact despite the height.
Parking totals 644 spaces, 604 of them under cover. Registered unit types and carpet areas follow.
| Configuration | Carpet area range (sq ft) | Units |
|---|---|---|
| 3 BHK | 1,125-1,362 | 288 |
| 4 BHK | 1,701-2,303 | 65 |
| 5 BHK | 2,809-2,998 | 3 |
Carpet area counts only the floor inside the walls. Pricing uses saleable area, which adds balconies and a portion of common spaces, so the smaller 3 BHK is sold as roughly 1,864 sq ft. The biggest units include some duplexes and penthouses.
Hafeez Contractor designed the project. A clubhouse of over 17,000 sq ft anchors more than 45 amenities, among them yoga decks, a forest trail, a library, a games room, a gym, a swimming pool and courts for squash and badminton.
RERA Registration and Timeline
Bangalore Development Authority (BDA) approval of the plan is dated 18 November 2025. Puravankara Limited then received RERA registration PRM/KA/RERA/1251/310/PR/151225/008338 on 15 December 2025, and the portal record carries the name Purva Silversky.
Registered dates run from a 2 January 2026 start to completion on 30 July 2030, and the seller is legally held to that completion date. The project is still in its launch phase, since the quarterly RERA update of August 2026 showed no finished floor slabs. A 2026 booking means paying instalments while also covering rent or a running EMI for nearly four years.
Water is planned to come from the city municipal council of Hebbagodi. This supply arrangement is worth confirming in the sale agreement.
Price and Added Charges
A 3 BHK is priced from Rs. 2.55 Crore, and the exact figure moves with size, floor and view. In place of slab-linked demands, Puravankara offers a 15:20:20:20:25 annual plan split over five instalments.
Over and above the agreement value of a home still being built, budget for:
- GST
- Stamp duty and registration (Karnataka charges 5% duty plus cess and surcharge above Rs. 45 Lakhs, and 2% registration)
- Premiums for floor rise and view
- Clubhouse fees, a maintenance deposit, and any extra parking slot
Duty and registration on a Rs. 2.55 Crore home add up to roughly Rs. 19.4 Lakhs. The EMI calculator gives the monthly payment on the planned loan. Divide the price by the specific flat's carpet area to get a true per sq ft rate.
Is It the Right Fit?
The project centres on big homes, so it suits families employed around Electronic City or the Hosur Road corridor who want three or four bedrooms in a high-rise. Entry is near Rs. 2.55 Crore, with completion registered for July 2030.
That timeline is long for anyone who must move within two or three years. Without 1 or 2 BHK units, smaller budgets will find better matches around Electronic City Phase 2. Resale demand is thinner for large flats than for compact ones, a point for short-term holders.
The Developer
Founded in 1975 and based in Bangalore, Puravankara is a listed developer. Its Purva brand covers premium homes, Provident covers mid-priced housing and Purva Land handles plots. Purva Westend in Kudlu Gate, a finished project off Hosur Road, gives a sense of its finish and upkeep.
Before Booking
A big ticket and a long build call for care at the start. Points to cover:
- Match tower and flat number with the registered details on the state RERA site
- Time the journey to Hebbagodi and Huskur Road metro stations
- See how near the western industrial area is to the tower in question
- Get the flat's carpet, balcony and saleable figures in writing
- Ask for a cost sheet that breaks out parking, maintenance, premiums and GST
- Confirm all five instalment dates prior to signing
- Send money only to the RERA-registered project account
Availability differs across towers and floors and changes with sales. Ask us which Purva Silversky homes are open, along with the current price sheet.



