Koramangala rarely gets a new apartment project, and Shriram Esquire by Shriram Properties is one of the few under construction there. This South Bangalore development has just 64 homes, nearly all 3 and 4 BHK, in a pair of low-rise towers. Every home is booked, so this guide covers RERA status, address, towers, sizes and how buying works today.

RERA Status and Progress

Karnataka RERA granted registration PRM/KA/RERA/1251/310/PR/080223/005702 in February 2023. Shriram Properties Limited is the promoter, with 19 January 2027 as the registered completion date. Confirm it on the state's RERA portal.

Work began in January 2023. The July 2026 quarterly update put overall progress at 74%, with 75% for Tower A and 81% for Tower B. Finishing, lifts, the occupancy certificate and landscaping remain, pointing to possession during 2027.

Address and Surroundings

The project is in 1st Block, Koramangala (Bengaluru 560034), on Site Nos. 91 to 98 of HBCS Layout, Nirguna Mandir Layout. This is the Ejipura side, with a road to the north and private property on the remaining three sides. The Bangalore Development Authority approved the plan on 11 January 2023.

Key places nearby include:

  • Hosur Road, leading to Electronic City, with Christ University on it
  • The Inner Ring Road towards Domlur and Indiranagar
  • Koramangala's inner-block shops and restaurants, and the Sony World junction
  • Manipal Hospital (Old Airport Road) and St John's Medical College Hospital

Travel is mostly by road, since Koramangala is without its own metro station for now. The Koramangala locality page describes the area further.

Two Low-Rise Towers

The land measures 4,751 sq m, or roughly 1.17 acres. With buildings on 1,396 sq m, close to 70% of the plot is open. One shared basement holds the parking.

The layout is:

  • Tower A: 31 homes, ground plus seven floors
  • Tower B: 33 homes, ground plus eight floors
  • A typical floor of four homes in either tower
  • 138 covered car parks out of 158 in all

At this height, each floor has few neighbours and lift waits are short. The approved plan has a 307 sq m clubhouse, a gym, an indoor games area and a swimming pool. A concierge desk, a squash court, a barbecue area and a yoga deck complete the amenities.

Home Sizes

Of the 64 homes, 40 have three bedrooms and 23 have four, and the lone 2 BHK is on Tower B's top floor. The 3 BHK has close to 1,940 sq ft of built-up area, and the 4 BHK close to 2,360. Carpet areas are smaller, as in any project.

Registered carpet areas are approximately as follows.

HomeCarpet area (sq ft)Carpet area (sq m)
3 BHK1,243 to 1,257115 to 117
4 BHK1,524 to 1,551142 to 144
2 BHK94087

Every home also gets its own balcony, 3 to 7 sq m in size. Here carpet area comes to about 64% of built-up area, so compare projects on carpet.

Pricing and Buying a Booked Home

The launch price was Rs. 3.16 Crore onwards for a 3 BHK and Rs. 3.9 Crore onwards for a 4 BHK. On built-up area, the rates are near Rs. 16,300 and Rs. 16,500 a sq ft. The July 2026 update to Karnataka RERA has all 64 homes and every parking space booked.

A home is on offer only if a current buyer sells, at a price settled with that seller. Until handover, the sale takes the form of a booking transfer. Plan for these costs and steps:

  • What the seller has paid to date, and any premium on top
  • Instalments still payable to the developer on the original plan
  • Written consent from the developer and the transfer fee it charges
  • GST on unpaid instalments, the building being incomplete
  • 5% stamp duty for homes over Rs. 45 Lakhs (5.6% after cess and surcharge)
  • A 2% registration fee

Weigh the available homes against their quoted prices. Loan figures are easy to work out on the EMI calculator.

Who Should Consider It

It fits families after a big, new, central-city apartment who would choose a small building over a campus. Koramangala is largely independent houses and older apartment blocks, so new projects are rare. Commutes stay short for those working in HSR Layout, Koramangala or on the Inner Ring Road.

It is a weaker fit for anyone after a 2 BHK, a ready home or wide open grounds. With every home booked, buying now means taking over an existing buyer's booking.

Checks for a Booking Transfer

Anyone taking over a Shriram Esquire booking should verify:

  • All payment receipts with the seller's sale agreement
  • The developer's letter of consent and dues statement for the flat
  • A match between the agreement's RERA number and the portal
  • The possession date and delay clause the new buyer inherits
  • The flat's carpet area, balcony area and two allotted parking spaces
  • A release letter from the lender if the booking carries the seller's home loan

At this ticket size, have a lawyer review the transfer papers. Visit the site to see how far finishing has progressed. Other projects by the builder appear on the Shriram Properties page.

Frequently Asked Questions

Does Shriram Esquire have RERA approval?+
Yes. Karnataka RERA registered it in February 2023 under PRM/KA/RERA/1251/310/PR/080223/005702, in the name of Shriram Properties Limited. Registered completion is due by 19 January 2027.
How many apartments does Shriram Esquire have?+
It has 64 homes across two towers. Tower A has 31 on ground plus seven floors, and Tower B has 33 on ground plus eight. The mix is 40 three-bedroom, 23 four-bedroom and one 2 BHK.
How big are the homes at Shriram Esquire?+
The 3 BHK has close to 1,940 sq ft of built-up area and the 4 BHK close to 2,360 sq ft. Their carpet areas run from 1,243 sq ft to 1,257 sq ft, and from 1,524 sq ft to 1,551 sq ft.
Can a home still be bought at Shriram Esquire?+
Only through a booking transfer from an existing buyer, at a price settled with that seller. Karnataka RERA's portal had all 64 homes booked in its July 2026 update.
What is the possession date for Shriram Esquire?+
RERA has 19 January 2027 as the completion date. Progress was 74% in the update of July 2026, which makes 2027 the likely year of possession.