Aditri Tulips, Chikkadasarahalli (Sarjapura): Plot Buyer's Guide, October 2026

Chikkadasarahalli Village, part of Anekal Taluk's Sarjapura Hobli, has a new plotted layout called Aditri Tulips, with 91 residential sites. Its Karnataka RERA registration came through on 29 September 2026, and work is in progress towards a completion date of 15 December 2027. Below are its key facts, plot mix, approvals, costs and booking checks, plus a note on an older layout with the same name.
Key Facts
The registered details of this South East Bangalore layout are:
- Promoter: Aditri Tulips, registered as a partnership firm
- Land parcels: Survey Nos. 47/2, 46/2 and 46/4
- Land: 20,133 sq m, close to 4.97 acres
- Sites: 91, all residential
- Plan sanction: issued by the Anekal Planning Authority on 31 October 2025 under ADA/LAO/39/2025-26
- Work began on 15 December 2025, with completion set for 15 December 2027
- K-RERA registration: PRM/KA/RERA/1251/308/PR/290926/008977
Is It the Right Fit?
It suits a buyer seeking a standard site, 30x40 or 30x50, on the outer edge of the Sarjapura belt to build a home on. The project is small, roughly 5 acres, and already holds a planning sanction and RERA registration. Buyers should be ready to wait while roads, drainage and power are completed.
Because the promoter is a newly formed firm, the decision rests on paperwork rather than reputation. Anyone wanting a completed layout with homes already standing has wider options nearer Sarjapur town and on Sarjapur Road.
Site Sizes and Land Use
The layout offers both regular formats common to Bangalore house designs, plus some irregular sites:
- 26 sites of 1,200 sq ft, each 30x40 ft
- 34 sites of 1,500 sq ft, each 30x50 ft
- 31 odd-sized sites, from 727 to 1,964 sq ft
Roughly two in three sites are regular, which makes them simpler to plan, fund and resell. Irregular or small sites leave a tighter building footprint once setbacks apply, so get the plot schedule and verify the measurements of the specific site.
Sites cover 11,036 sq m, slightly more than half the land. Roads take 5,852 sq m, parks and open space 2,236 sq m and the civic amenity site 1,009 sq m. The internal roads have a 9 m width, with water drawn from borewells and the panchayat supply.
Two Projects Share the Name
An older Aditri Tulips layout also exists in Chikkadasarahalli, and listings often mix the two up. They cover separate land parcels and were registered by different firms.
- The 2018 project: Aditri Projects LLP registered it on 22 October 2018 as PRM/KA/RERA/1251/308/PR/181022/002085. It has 101 plots on Survey No. 63, a BMRDA plan and a completion date of 26 January 2020.
- The 2026 project: a partnership firm named Aditri Tulips registered it on 29 September 2026. It has 91 plots on three survey numbers, an Anekal Planning Authority plan and completion due by 15 December 2027.
Resale listings under the name are mostly from the Survey No. 63 project. The new firm has no prior project on the Karnataka RERA register, so every paper for a fresh booking must show all three of its survey numbers along with the registration number issued in 2026.
Registration, Title and the JDA
Buyers can verify the registration online at the K-RERA portal, which also hosts the sanctioned layout plan and plot schedule. Development was 21% complete when the project was registered.
The land owners have signed joint development agreements, duly registered, and the Deputy Commissioner has issued orders converting it to residential use. A JDA splits the sites between owners and promoter, so confirm which party may sell the selected site and who will execute the sale deed.
Where It Is and How It Connects
Chikkadasarahalli is past Sarjapur town, on the Anekal side, in the outer belt rather than the Sarjapur Road office stretch. Land costs less here than nearer the Outer Ring Road, but trips to the tech parks take longer.
Work on the Satellite Town Ring Road is going on in phases along the city's periphery, on an alignment through this part of Anekal Taluk. Shops, schools and hospitals cluster around Sarjapur town and closer in on Sarjapur Road. Driving to work at rush hour from the site gives the clearest picture of daily life.
What the Plot Really Costs
Aditri Tulips quotes prices on request. Weigh the per sq ft rate against the government guidance value and sale deeds registered lately in the village, then add:
- Stamp duty in Karnataka of 5% with cess and surcharge, 5.6% overall, above Rs. 45 Lakhs
- A 2% registration fee on the property value
- Any development, clubhouse or maintenance charge shown on the cost sheet
- Lawyer's fees for title verification and the sale deed
Duty is levied on the higher of the sale price and the guidance value. Building the house comes afterwards and frequently costs more than the land. Plot loans also differ from home loans, as most banks lend a smaller share of the value.
Booking Checklist
A fresh layout from a first-time promoter needs thorough checks:
- Look up the promoter's name and registration number on the K-RERA portal
- Make sure documents cite Survey Nos. 47/2, 46/2 and 46/4, not Survey No. 63
- Inspect the Anekal Planning Authority sanction and the approved plan
- Study the JDA and the land conversion orders covering the site's survey number
- Get a lawyer's title opinion on the particular plot
- Visit and compare how far the roads, drainage and power cabling have reached with the schedule
- Make payments only to the RERA-designated account of the project
Instalments tied to development progress protect a buyer better than a heavy upfront payment. The developer can help weigh this against other plotted options in the Sarjapura belt and across East Bangalore.



