Down by the Water, Jakkur: Total Environment's Lakeside Homes Explained (October 2026)

On the edge of Jakkur Lake, North Bangalore, Total Environment is building a luxury apartment community called Total Environment Down by the Water. Work is in progress, and the registered finish falls on 31 May 2031. Below, buyers will find the key facts, the buyer profile, location, homes, prices, RERA details, amenities and booking checks.
Key Facts
A single Karnataka RERA registration covers the whole project. Its essentials are summed up here.
- Promoter: Total Environment Building Systems Private Limited
- Address: next to Jakkur Lake, Gashtikempanahalli village (Yelahanka hobli), 560064
- Site: 41,459 sq m, close to 10.2 acres
- Scale: 602 flats over five towers
- Towers: each with 16 upper floors over a ground floor and two basements
- Finish date on record: 31 May 2031
- Water: BWSSB supply
- Plan sanctioned by: Bruhat Bengaluru Mahanagara Palike (BBMP)
- Lowest ticket: Rs. 5.62 Crore onwards
Is It the Right Buy?
The project is aimed at a family wanting a very spacious lakeside flat and willing to wait until 2031. Even the smallest plan, 2,490 sq ft, beats most 4 BHK flats in North Bangalore, and budgets begin past Rs. 5.5 Crore. Anyone needing to move in over the next two or three years should look at ready or nearly ready homes elsewhere in North Bangalore.
Setting and Commute
Set along Bellary Road, between Yelahanka and Hebbal, Jakkur is a mainly residential pocket of North Bangalore. The plot covers survey numbers 7/2, 6/2 and 6/1 in Gashtikempanahalli village, Yelahanka hobli. Because the lake marks the western edge, views on that side will stay open.
Bellary Road, or NH 44, links Jakkur south to Hebbal and north to Kempegowda International Airport. The closest big employment hub is Manyata Tech Park, off the Outer Ring Road. Daily needs like schools, hospitals and shopping are spread over Jakkur, Yelahanka and Sahakara Nagar.
Namma Metro's airport Blue Line is being built along Bellary Road, and Jakkur Cross is a planned station. Its opening has slipped more than once, so count it as a later gain. Driving to work at rush hour from the site is the most honest test of the commute.
Plans, Sizes and Price List
Every one of the 602 flats is filed as a 3 BHK on the RERA record. Tower 1 has 66 homes, four per typical floor, while Towers 2 to 5 have 134 each, eight per typical floor. Carpet areas come in three bands:
- Between 1,717 and 1,725 sq ft
- Between 1,839 and 1,845 sq ft
- Roughly 1,995 sq ft
Parking on record is 1,204 covered bays plus 25 open ones, so each flat gets two covered spots. Sales plans use saleable area, which is why they read bigger than the carpet figures. Five plans are on offer.
| Opening price | Plan | Saleable sq ft |
|---|---|---|
| Rs. 5.62 Crore | 3 BHK + study | 2,490 |
| Rs. 5.91 Crore | 3 BHK + home office | 2,628 |
| Rs. 7.27 Crore | 3 BHK + study, home office, maid's room | 3,240 |
| Rs. 11.2 Crore | 4 BHK + study, home office, maid's room | 4,980 |
| Rs. 14.6 Crore | 4 BHK + study, home office, maid's room (larger) | 6,480 |
All five work out near Rs. 22,500 a sq ft on saleable area. Note that the two biggest plans are marketed as 4 BHK, though the registration shows only 3 BHK units. Buyers of the 4,980 sq ft and 6,480 sq ft homes should confirm how the agreement describes the home and which registered units the home includes.
What the Purchase Really Costs
The range runs from the entry 3 BHK with study, priced at Rs. 5.62 Crore, up to the biggest 4 BHK, priced at Rs. 14.6 Crore. On the entry home, 5.6% stamp duty (cess and surcharge included) plus 2% registration adds roughly Rs. 42.7 Lakhs. Under-construction GST, floor rise, parking and maintenance deposits come on top, so compare written cost sheets.
For illustration, banks fund at most 75% of value on loans above Rs. 75 Lakhs, so 25% down on a Rs. 5.62 Crore price means roughly Rs. 1.41 Crore paid upfront. The loan of roughly Rs. 4.21 Crore costs around Rs. 3.66 Lakhs monthly at 8.5% over 20 years. Run other amounts through the EMI calculator.
Timing weighs as heavily as price. Until the May 2031 finish, a construction-linked loan means interest on every released stage for years, and renters carry rent on top until handover.
RERA Details
The Karnataka RERA authority issued registration PRM/KA/RERA/1251/472/PR/090824/006967 on 9 August 2024. On record, the project began on 1 July 2024 and has to be finished by 31 May 2031. As of October 2026 that original date has had no extension.
Total Environment Building Systems Private Limited is the promoter, with the landowners joining as co-promoters through a joint development agreement (JDA). BBMP sanctioned the building plan on 1 July 2024. As of October 2026, the portal lists no complaints against the project.
Shared Facilities
The centrepiece is a 24,000 sq ft clubhouse, along with a lakeside walkway. RERA data puts open space at about 78% of the land. Facilities planned:
- Regular and heated swimming pools
- Gym, plus squash, badminton and tennis courts
- Indoor games, a theatre, a library and a lounge
- A multipurpose hall and guest suites
- Clinic, pharmacy, convenience store and cafeteria
- Spa and salon
- Jogging and cycling tracks, and a canine club
- Play area for children
The Developer
Set up in July 1996, the Bangalore-based Total Environment builds in Bangalore, Pune and Hyderabad. It is known for green terraces, exposed brick and fine interior detailing. Buyers pick layouts and finishes on eDesign, the firm's in-house design tool.
Such detailing is slow to deliver, and some of its older Bangalore phases show extended finish dates in their RERA records. Touring a finished community reveals how its woodwork, gardens and shared spaces have held up.
Pre-Booking Checklist
For a purchase this large, get every answer in writing before paying the booking amount.
- Check that the RERA number, promoter and finish date on the portal match the sale agreement.
- Get the carpet area of your unit and set it against the cost sheet's saleable size.
- Pin down tower, floor and facing, as homes facing the lake cost more.
- Go through the newest quarterly update online and see the site in person.
- Have a lawyer study the lake buffer on the sanctioned plan, the JDA and the title.
- Study the delay compensation and customisation clauses of the agreement.