Sterlitee Regal Park, Hulimangala: What Villa Buyers Should Know (October 2026)

Sterlitee Developers launched the villas of Sterlitee Regal Park on 26 September 2026, in a gated layout at Hulimangala in South Bangalore, to the south of Electronic City. Its 251 plots, spread over about 22 acres, carry villas of four and five bedrooms with prices starting at Rs. 4.3 Crore.
The Layout and the Four Villa Designs
The registration describes a plotted development with 251 plots across 22.25 acres. Its approved plan keeps 10 parks, about 3.3 acres in all, and internal roads that are 50, 40 and 30 feet wide. Within the 251 are one commercial plot and 20 small plots kept for economically weaker sections.
Regular plot sizes and their counts are in the table.
| Size of plot | Number of plots |
|---|---|
| 40 x 65 ft | 27 |
| 40 x 50 ft | 17 |
| 35 x 55 ft | 39 |
| 35 x 50 ft | 51 |
| 30 x 50 ft | 55 |
| Irregular shapes | 36 |
Buyers choose among four villa designs. Avira (35 x 50), Riora (30 x 50) and Selora (35 x 55) are four-bedroom villas, and Elora is the five-bedroom villa for the 40 x 50 size.
A clubhouse, a skating area, a jogging track, courts for basketball and tennis, a yoga deck and a children's play area appear among the parks on the master plan. Only the plots, roads and parks come under the RERA registration, and the clubhouse is outside it. For that reason, the agreement should record how big the clubhouse will be and when it will be finished.
Villa Prices and Additional Costs
Rs. 4.3 Crore is the starting price of a villa at Sterlitee Regal Park. The exact figure moves with plot size, design and where the plot is in the layout, with park-facing and corner plots usually at a premium. Have the built-up area for the selected design put in writing and calculate the per sq ft rate from it.
Plotted-layout villas are commonly sold on two documents: the sale deed covers the plot and the construction agreement covers the house. Across the two, expect these costs:
- GST on the construction portion
- On the registered value, stamp duty and registration: Karnataka charges 5% duty plus cess and surcharge above Rs. 45 Lakhs, and 2% registration
- Charges for the clubhouse and infrastructure, plus a maintenance deposit
- Changes made to the villa's standard specification
The EMI calculator gives the monthly instalment on the intended loan. Villa loans are released in stages as construction advances, so check how the lender treats plot and building.
RERA Status, Possession and Progress
Karnataka RERA granted registration PRM/KA/RERA/1251/308/PR/180925/008098 to Sterlitee Developers LLP on 18 September 2025. The layout plan had Bangalore Development Authority approval from 25 March 2024. Verify the number on the state RERA portal by searching Sterlitee Regal Park, the registered name.
The layout, started in April 2024, has to be complete by 31 December 2028 under the registration. In July 2026 the quarterly RERA update reported roads, parks and civic amenity sites as 95% complete. The land carries an A-Khata, water comes through the panchayat, and no litigation is declared in the registration.
Being a plotted development registration, it holds the developer to the layout's completion date. Each villa's date is set by its construction agreement, which must name the date of handover and the compensation for delay.
Where It Is and How to Get There
The project address is Hulimangala village, 560105, which belongs to Anekal Taluk's Jigani Hobli. Its survey numbers are 345, 348/2, 348/3, 344/4, 344/1, 344/5 and 342/1 up to 342/5. Hulimangala village separates Jigani from Electronic City and has roads out to NICE Road, Hosur Road and Bannerghatta Road.
The nearest metro stations are at Electronic City, on Namma Metro's Yellow Line, which opened between RV Road and Bommasandra in August 2025. Reaching them takes a car, cab or two-wheeler. Towards Electronic City, the chief landmarks are the Infosys and Wipro campuses and Narayana Health City.
Between the layout and Electronic City, the village roads are less wide than the main ones. Before deciding, time the peak-hour drives to office, school and metro station.
The Developer
HSR Layout is the base of Sterlitee Developers LLP, a Bangalore firm whose first Karnataka RERA project is Regal Park. The founders previously built Royal Regalia and Royal Residency in Electronic City Phase 1. Visiting both and speaking with residents is the practical test of build quality and upkeep.
Buyers It Fits
The project targets a family seeking an independent house on its own plot that is willing to live away from the Electronic City core. With budgets starting above Rs. 4 Crore, the typical buyer is upgrading from an apartment for a long stay.
It suits less a buyer who needs schools, shops and a metro station within a walk. Villas in plotted layouts also mean more paperwork than flats, as explained above. Buyers who value a long track record of finished villa projects should factor that in.
What to Verify Before Booking
At this price, have a lawyer read every document, and work through these points:
- On the RERA portal, check that plot number and size agree with the approved layout
- Find out which documents will be signed, and have a property lawyer go through the construction agreement and sale deed
- Obtain the villa's built-up area, specification and handover date in writing
- Ask what compensation the agreement provides for a delayed villa
- Get the clubhouse size and completion date into the agreement
- See Royal Regalia and Royal Residency to judge the finish after years of use
- Drive to Electronic City and the metro station from the layout during peak hours
- Insist on a cost sheet listing construction, plot, registration, GST and club charges separately
Plot choice is at its widest in the weeks following a launch. Ask the developer which Sterlitee Regal Park villas are open and for the current price sheet.



