Pride Euphora, Old Madras Road: Homes, Prices and Progress (October 2026)

Beyond KR Puram, at Bhattarahalli along Old Madras Road, East Bangalore, Pride Group is building Pride Euphora, a three-tower apartment project that some adverts call Pride KR Puram. What follows covers its registration, homes, prices, setting, building progress and the checks worth making before booking.
Registered Facts
The Karnataka RERA number for Pride Euphora is PRM/KA/RERA/1251/446/PR/080824/006965, dated 8 August 2024. Pride Housing is the promoter, and Pride & Expert Properties Private Limited shares revenue with it. The BBMP sanctioned the building plan on 28 March 2024, and completion is proposed for 30 September 2027.
The residential apartment site is Khata 275, Survey No. 21/1, beside Old Madras Road in Bhattarahalli Village, Bengaluru 560049, measuring 9,696 sq m, or roughly 2.4 acres. Each of the three towers (A to C) rises 18 upper floors over a ground level and 2 basements. Their 212 homes divide into 154 three-bedroom, 40 four-bedroom and 18 two-bedroom units.
Certain descriptions mention 220 homes, every one a 3 BHK, handed over from June 2028. The registration instead shows 212 homes of three sizes, due by 30 September 2027, and those registered numbers are what the sale agreement uses.
Setting and Commute
The project fronts Old Madras Road directly, as the highway runs along the site's northern edge, in Bhattarahalli Village of Bengaluru East Taluk, PIN 560049. It is east of KR Puram, heading towards Hoskote.
Westward, the road reaches KR Puram and its junction with the Outer Ring Road; eastward, it continues to Hoskote. Namma Metro's Purple Line passes through KR Puram on its way to Whitefield, while the airport-bound Blue Line from KR Puram is being built. Office-hour traffic builds up near KR Puram, so try the drive at peak time.
Families with jobs in Mahadevapura, Whitefield or along the eastern Outer Ring Road will find the commute manageable. From here, offices in North or South Bangalore mean a long trip across the city.
Plans and Pricing
The price list has six layouts, opening with a 3 BHK at Rs. 2.01 Crore and topping out with the biggest 4 BHK at Rs. 3.92 Crore:
| Saleable Size (sq ft) | Layout | Starting Price |
|---|---|---|
| 1,541 | 3 BHK, two bathrooms | Rs. 2.01 Crore |
| 1,693 | 3 BHK, three bathrooms | Rs. 2.18 Crore |
| 1,772 | 3 BHK, three bathrooms | Rs. 2.28 Crore |
| 1,927 | 3 BHK, three bathrooms | Rs. 2.54 Crore |
| 2,856 | 4 BHK | Rs. 3.76 Crore |
| 2,982 | 4 BHK | Rs. 3.92 Crore |
Rates stay close to Rs. 13,000 for each saleable sq ft across all six. Tower A also contains the 18 registered two-bedroom flats, each of 719 sq ft carpet, and buyers wanting something smaller should ask whether any are on sale.
The agreement itself uses carpet area, less than the saleable size quoted. Registered carpet areas are 719 sq ft for the 2 BHK, 930-1,175 sq ft for the 3 BHK and 1,805-1,814 sq ft for the 4 BHK, with top-floor 4 BHK penthouses at roughly 1,860-1,910 sq ft. A quick look at the RERA unit list, which gives every flat's carpet area by tower and floor, removes any doubt about size.
Added Costs and a Loan Example
Each instalment on an under-construction flat carries GST. At registration, 5.6% stamp duty and a 2% fee are paid, close to Rs. 15.3 Lakhs together for the cheapest 3 BHK, priced Rs. 2.01 Crore.
For illustration, lenders cap loans over Rs. 75 Lakhs at 75% of value, so that flat with 25% paid down needs a loan near Rs. 1.51 Crore. Over 20 years at 8.5% annual interest, the EMI comes to roughly Rs. 1.31 Lakhs monthly. Other prices can be tested on our EMI calculator.
Layout and Shared Spaces
The three towers share one height across the 2.4-acre plot. Tower A holds 72 homes, while B and C hold 70 apiece, with four flats on a typical floor. Their small footprint leaves around 80% of the land open.
Amenities match a mid-sized community on a compact site, led by a swimming pool and a clubhouse. Registered parking is 299 covered bays across the two basements plus 14 in the open. Fitting 212 homes onto roughly 2.4 acres gives a density near 88 homes per acre.
Construction Progress
Work was registered to begin on 2 May 2024 and finish by 30 September 2027, and building is in progress. In the January 2026 quarterly filing, overall progress was 45%, with Tower A up to its seventh floor.
Adverts describing the flats as ready to move into run ahead of reality, as the registered timetable puts possession around a year out. The state RERA portal carries the number along with approved plans and quarterly updates, and BWSSB supply is the registered water source.
Who It Suits
It suits families seeking a roomy 4 BHK or 3 BHK with direct Old Madras Road access and more than Rs. 2 Crore to spend. A near possession date eases the burden for current renters, and the three-tower plan appeals to those who like a mid-sized community.
Anyone wanting a sprawling township with big sports grounds should compare larger projects along the same road. A main-road address brings traffic noise along with convenience, so visit during rush hour.
Before Booking
Clear these points before paying the booking amount:
- Check that carpet area, unit number, floor and tower in the agreement match the RERA unit list
- Weigh the chosen tower's latest quarterly progress against completion due September 2027
- Get a dated cost sheet listing GST, car park, floor rise, maintenance deposit and clubhouse charges
- Obtain the payment plan and the late-possession terms
- Have a lawyer review title papers and the revenue-share deal between the two firms
- Make every payment into the project account designated under RERA
Prices shift with tower, facing and floor. A quote in writing for the precise flat counts for more than any starting figure.