North Bangalore Shortlist: Carnatica, Trimaya, Ananda and Lumina Side by Side

By Propmonk Editorial Team·20 November 2026·6 min read
Main Elevation - TATA Varnam Phase 1

Buyers scanning north and north-west Bangalore keep landing on the same shortlist: Brigade Lumina, Tata Carnatica, Godrej Ananda and Birla Trimaya. People lump them together as pre-launches, but each holds Karnataka RERA registration at its own stage. Here they are compared on where they are, land, home counts, price, completion dates and sales, all from figures a buyer can verify on the RERA portal.

Who Is Building What

Tata Housing is developing Tata Carnatica, a township spread over more than 135 acres at Shettigere in Devanahalli. Plot phases Raagam and Swaram launched first, and Tata Varnam now adds flats, row houses and townhouses. In the same village, Birla Estates is building Birla Trimaya over 52 acres, most recently releasing Birla Trimaya Phase 4.

Godrej Properties has placed Godrej Ananda on a housing plot within Bagalur's Hi-Tech Defence and Aerospace Park, split into three registered parts. Of these, Godrej Ananda Phase 2 nears completion, while work continues on the final one, Soul at Godrej Ananda. Over on Tumkur Road to the north-west, Brigade Group's Brigade Lumina has three towers and gained registration in March 2026.

Where Each One Is

Carnatica and Trimaya share Akkalenahalli-Mallenahalli village in Devanahalli taluk, towards Shettigere from Kempegowda International Airport. One body, the planning authority for the airport zone, approved both plans, and Carnatica's distance to the terminal is 6.8 km. The address being nearly identical, buyers choose on brand, format and price: Varnam blends flats with row houses and townhouses, whereas Trimaya is mainly flats grouped in three clusters.

Ananda is in Bagalur, on a residential plot the KIADB aerospace park set aside, so KIADB cleared its building plans. Namma Metro's Blue Line to the airport is being built without a confirmed opening date, so judge the purchase on current roads.

Lumina belongs to another corridor entirely, the national highway to Tumakuru, which puts it 27 km away from the airport and 1 km from IKEA. A Chikkabidarakallu station on the Green Line extension, opened to Madavara in November 2024, makes Lumina the lone project here with a working metro line close at hand.

The Registered Facts in One Table

This table puts the RERA details of all four next to each other:

ItemBrigade LuminaGodrej AnandaBirla TrimayaTata Carnatica (Varnam)
AddressChikkabidarakallu on Tumkur RoadBagalur, in the Aerospace ParkDevanahalli, off Shettigere Main RoadDevanahalli, at Shettigere
Approving bodyBDAKIADBBIAAPABIAAPA
Site size3.97 acres overall20.33 acres of land52 acres overall135+ acre township, with roughly 19.5 acres for Varnam
Homes on RERA416 overall4,053 over three registrations2,028 over four phasesVarnam 842, with 765 plots across Raagam and Swaram
FormatsFlats with two or three bedroomsFlats: studio, 1 BHK, 2 BHK, 3 BHKFlats of 1 to 4 BHK, plus duplexes and row housesFlats with 2, 3 or 5 bedrooms, plus row houses and townhouses
Registered firstMarch 2026March 2021August 2023Plots in February 2022, Varnam in August 2025
Completion as per RERADecember 2030Between January 2027 and August 2028Between October 2028 and December 2031Varnam: between August 2030 and September 2031
Entry price2 BHK costing Rs. 1.45 CroreFirst two parts are resalePhase 4 1 BHK costing Rs. 90 Lakhs2 BHK costing Rs. 2.03 Crore

Pricing and Home Sizes

Varnam is the priciest. A 1,380 sq ft 2 BHK opens with a Rs. 2.03 Crore tag, roughly Rs. 14,700 for each sq ft, while 4,131 sq ft buys a 5 BHK for Rs. 6.16 Crore upward. Townhouses and row houses fill the gap, opening around Rs. 4.12 Crore.

Entry is cheapest at Trimaya Phase 4: a 1 BHK near 485 sq ft costs Rs. 90 Lakhs upward, a 2 BHK near 801 sq ft Rs. 1.34 Crore upward and a 3 BHK near 1,100 sq ft Rs. 1.75 Crore upward. Lumina prices its 2 BHK, 1,099 sq ft super built-up, beginning around Rs. 1.45 Crore, which works out close to Rs. 13,200 a sq ft; a 3 BHK there needs Rs. 1.90 Crore or more.

Since these rates rest on different area measures, per sq ft figures do not compare cleanly. Divide the price instead by the specific unit's RERA carpet area. Carpet areas at Lumina range 713 to 1,139 sq ft of space, and Trimaya Phase 4 spans roughly 445 sq ft (1 BHK) up to near 1,084 sq ft (larger 3 BHK).

Take a home priced Rs. 1.45 Crore. Loans above Rs. 75 Lakhs cover no more than 75% of value, so a 25% down payment leaves a loan near Rs. 1.09 Crore. Over 20 years at 8.5% interest that is roughly Rs. 94,400 monthly. Stamp duty of 5.6% plus 2% registration come to about Rs. 11.02 Lakhs; those percentages apply at any price.

How Crowded Each Site Is

Dividing registered homes by land shows how differently the sites are packed:

  • Trimaya: 52 acres holding 2,028 homes, near 39 per acre
  • Varnam: roughly 19.5 acres holding 842 homes, near 43 per acre
  • Lumina: 3.97 acres holding 416 homes, near 105 per acre
  • Ananda: 20.33 acres holding 4,053 homes, near 199 per acre

Carnatica and Trimaya stay sparse thanks to row houses, low-rise blocks and wide open space, with no tower above 14 floors. Ananda and Lumina stack between 18 and 28 floors on tight sites, though Lumina's three slim towers still keep 82% of its land free of buildings.

Density is no defect: more families share the amenities, and prices usually come in lower. If calm internal roads matter most, the two Devanahalli townships fit; if budget leads, consider the other pair.

Construction and Sales Progress

The projects are furthest apart on stage, as the quarterly Karnataka RERA updates show:

  • Godrej Ananda: its first registration (806 homes) was fully built by April 2026, while Phase 2 (1,037 homes) was at 95% that month
  • Soul at Godrej Ananda: a 2,210-home part, 46% built by July 2026, with a 30 August 2028 deadline
  • Tata Varnam: four registrations, each 7% to 10% built by July 2026, with deadlines between 31 August 2030 and 30 September 2031 in place
  • Brigade Lumina: 8% built by July 2026, with a 31 December 2030 deadline
  • Birla Trimaya Phase 4: 2% built by July 2026, due on 15 December 2031

Sales were brisk everywhere. Just four months after registering, Lumina had sold 411 homes of 416, and Varnam had sold 694 of 842. Soul at Godrej Ananda showed 2,148 sold out of 2,210, and in April 2026 Trimaya Phase 4 showed 454 out of 548.

The newer launches have little left, so Ananda or Lumina will mostly mean resale. Trimaya's older phases finish sooner than Phase 4, with 31 October 2028 set for Phase 1 and 20 June 2029 for Phase 2. Ananda's first registration was due on 8 January 2026, since pushed to 8 January 2027.

Checks for Any of the Four

A big brand cuts risk but never replaces document checks:

  • The RERA number for your phase and tower, confirmed online, as every township holds several registrations
  • When that phase must be finished, and any extension granted
  • The carpet area written into the agreement, with the price calculated on it
  • In a joint development, the landowner's share, so you know who is selling the flat
  • A plan approved by the correct body, whether BIAAPA, KIADB or BDA
  • Any advance demanded before the agreement, capped at 10% of cost under RERA

Section 13 bars a promoter from collecting over 10% of the price until there is a registered, signed written sale agreement. For resale, focus moves to who holds title, any outstanding loan and an NOC from the builder. Visit on a weekday to see the real commute.

Frequently Asked Questions

Which project covers the most land, and which has the most homes?+
For land, Tata Carnatica wins, with over 135 acres. For homes, the leader is Godrej Ananda, with 4,053 under three registrations on 20.33 acres.
Where is the cheapest entry point?+
Birla Trimaya Phase 4, with a 1 BHK near 485 sq ft for Rs. 90 Lakhs. A Brigade Lumina 2 BHK costs Rs. 1.45 Crore upward, and Tata Varnam begins near Rs. 2.03 Crore.
Do Tata Carnatica and Birla Trimaya share a location?+
Yes. Akkalenahalli-Mallenahalli village, towards Shettigere in Devanahalli, is home to both, and BIAAPA, the planning authority for the airport area, approved each plan.
Are any of the four still at pre-launch?+
No, each one holds Karnataka RERA registration. Brigade Lumina registered in March 2026, Phase 4 of Birla Trimaya in January 2026, and Godrej Ananda's first part back in March 2021.
Which will be completed soonest?+
Godrej Ananda. By April 2026 its first registration was fully complete and Phase 2 had reached 95%. The other three, Tata Varnam, Brigade Lumina and Birla Trimaya Phase 4, carry RERA dates from August 2030 up to December 2031.

Related Reads

Call