Tata Varnam, Devanahalli: Phases, Prices and Booking Checks (October 2026)

By Propmonk Editorial Team·26 November 2026·5 min read
Main Elevation - TATA Varnam Phase 1

Tata Housing is building Tata Varnam as part of its Tata Carnatica township, off Shettigere Road in Devanahalli, North Bangalore. Sales opened on 15 August 2025 for 842 homes split over four RERA-registered phases, with apartment towers alongside low-rise townhouses and row houses. This guide walks through the homes, address, phase records, buyer fit, prices and checks.

The Homes and Towers

The four phases use close to 19.5 acres inside Carnatica. Phase 1A holds 24 townhouses and 24 row houses, grouped in three blocks. The other three phases carry 794 flats across 11 towers, T21 to T31, each rising 10 to 12 floors over two basements.

Three in five flats are 3 BHK units with two baths, and the RERA records give this mix.

ConfigurationCarpet area (average)Units
Row house: 4 BHK plus study2,415 sq ft approx.24
Townhouse: 3 BHK1,820 sq ft approx.24
Duplex: 5 BHK with 5 baths2,515 sq ft approx.22
3 BHK with 3 baths1,240 sq ft approx.247
3 BHK with 2 baths1,030 sq ft approx.489
2 BHK with 3 baths1,035 sq ft approx.24
2 BHK with 2 baths805 sq ft approx.12

These carpet figures count only the floor inside the walls, with each private balcony or verandah listed apart. The price list quotes bigger saleable areas, between 1,380 sq ft (2 BHK) and 4,131 sq ft (duplex). Get both numbers for the chosen unit and compare projects on the carpet rate.

Two clubhouses are planned, along with a pool, fitness centre, indoor and outdoor courts and landscaped gardens. Confirm which clubhouse serves the phase on offer and when it is due.

Where the Project Is

The address is pincode 562157, Devanahalli Taluk, Kasaba Hobli, in Akkalenahalli-Mallenahalli village, on Survey Nos. 37/10, 37/7, 37/4, 37/2, 37/1, 7, 2/2 and 1. This is the Shettigere end of Devanahalli, and Kempegowda International Airport is a 6.8 km drive. Along the northern boundary, the approved development plan shows an 18 m road.

Trips into Hebbal, Yelahanka and central Bangalore mostly use NH 44, the airport road. The Namma Metro Blue Line to the airport is still under construction and counts only as a future link. Big schools and hospitals need a drive, either along the highway or into Yelahanka.

Phase-Wise RERA Record

The promoter, One Bangalore Luxury Projects LLP, is a partnership of M S Ramaiah Realty LLP with Tata Housing Development Company. On 25 June 2025, the Bangalore International Airport Area Planning Authority approved its building plan, and every phase carries its own registration.

PartDue byUnits (sold by July 2026)Karnataka RERA registration
Phase 1A31 August 203024 townhouses, 24 row houses (48 sold)PRM/KA/RERA/1250/303/PR/110825/007988
Phase 1B31 August 2030285 flats in T28 to T31 (249 sold)PRM/KA/RERA/1250/303/PR/110825/007989
Phase 1C31 March 2031298 flats in T24 to T27 (262 sold)PRM/KA/RERA/1250/303/PR/110825/007990
Phase 1D30 September 2031211 flats in T21 to T23 (135 sold)PRM/KA/RERA/1250/303/PR/311225/008367

Registration came on 11 August 2025 for Phases 1A to 1C, with Phase 1D added on 31 December 2025. Progress filed in July 2026 was only 7% to 10%. With every townhouse and row house booked, buyers now pick among flats, mostly in Phase 1D.

Some adverts use the name "Tata Varnam Phase 2", yet in October 2026 the portal shows no registration by that name. Any new part of Varnam needs a fresh registration before sale, and the four numbers above can be verified online.

Who Should Consider It

A family wanting a spacious 3 BHK in a quiet, low-rise, low-density setting, ready to wait for keys until 2030 or 2031, is the natural fit. Frequent flyers and people working in the business parks near the airport also gain. Density is about 43 homes per acre, and no tower goes past 12 floors.

The long wait is the real cost, as a tenant-buyer pays rent plus EMIs for four to five years. Commuting each day to East or South Bangalore takes long, so it works best with a job in the north.

Price and Cost Sheet

Entry is a 1,380 sq ft 2 BHK at Rs. 2.03 Crore, and the top is a 4,131 sq ft duplex at Rs. 6.16 Crore. On saleable area that works out near Rs. 14,700 a sq ft. Tower, floor and view change the rate, so request the live cost sheet from us.

Look for the basic rate, floor rise, parking, clubhouse fee, maintenance deposit and GST, payable because the home is under construction. Karnataka charges 5% stamp duty past Rs. 45 Lakhs, or 5.6% after cess and surcharge, with 2% registration, both due at the sale deed.

For illustration, take the Rs. 2.03 Crore unit, where 25% goes down because banks lend at most 75% of value once the loan crosses Rs. 75 Lakhs. That leaves a loan near Rs. 1.52 Crore and an EMI of roughly Rs. 1.32 Lakhs monthly at 8.5% over 20 years. Try other figures in our EMI calculator.

Booking Checklist

In a phased project that runs for years, the papers for the exact tower matter more than any brochure.

  • Link the tower with the right phase, then see that the agreement quotes that phase's RERA number.
  • Match the agreement's handover date with the registered date for the phase.
  • Send money only to the RERA escrow account of the same phase.
  • Set the agreement's carpet area beside the cost sheet's saleable figure.
  • Get the payment plan and make sure each instalment follows a construction stage.
  • Find out what is planned on the land kept for future development on the south side.
  • Go through the quarterly progress filings online before every big payment.

The gram panchayat supplies water, and Phase 1D adds borewells, so ask how supply copes when all 842 homes fill up. Weigh the price and dates against Devanahalli apartments that finish sooner. The developer's other launches are listed under Tata Housing.

Frequently Asked Questions

Does Tata Varnam have RERA registration?+
Yes. Every one of its four phases (1A, 1B, 1C, 1D) has its own Karnataka RERA number, and One Bangalore Luxury Projects LLP is the registered promoter for all of them.
How much does a home at Tata Varnam cost?+
The 2 BHK opens at Rs. 2.03 Crore (1,380 sq ft), while the duplex of 4,131 sq ft is priced at Rs. 6.16 Crore. The rate is close to Rs. 14,700 a sq ft.
What are the Tata Varnam completion dates?+
Phases 1A and 1B are due by 31 August 2030, Phase 1C by 31 March 2031 and Phase 1D by 30 September 2031, as registered.
Which home types does Tata Varnam offer?+
It has 794 flats in 11 towers, mainly 3 BHK with a few 2 BHK units and 5 BHK duplexes. Beside them are 24 row houses and 24 townhouses.
Is Tata Varnam Phase 2 registered?+
Not in October 2026. No such registration appears on the state RERA portal, which lists only Phases 1A, 1B, 1C and 1D.
What is the distance from Tata Varnam to the airport?+
Kempegowda International Airport is a 6.8 km drive from the project.

Related Reads

Call