Lodha Mirabelle, Thanisandra: A Guide for Home Buyers (October 2026)

By Propmonk Editorial Team·26 November 2026·6 min read
Lodha Mirabelle Phase 1

Marketed under the Lodha name, Lodha Mirabelle brings high-rise apartments to Thanisandra Main Road, right beside North Bangalore's Manyata Tech Park. Its five towers with 721 units carry two separate Karnataka RERA registrations. Below are the setting, both phases, layouts, prices, building progress, total cost and the checks worth making before booking.

Two Phases, Five Towers

Mirabelle belongs to a wider residential campus of 19 acres, which also contains older towers from the same promoter. Its own towers carry numbers 3 to 7 and split into two registrations:

  • Towers 5, 6 and 7 (Phase 1): 437 registered units, 28 floors in each, completion by 30 June 2028
  • Towers 3 and 4 (Phase 2): 284 homes, at 30 and 39 floors, completion by 31 May 2030

Within Phase 1 are 88 studio units below 175 sq ft, mostly in Tower 7 next to the 4 BHK homes, so the apartment count without them is 349. Across the campus, the plan provides a central green of 3.2 acres and Club Luxuria, a recreation and fitness complex of 45,000 sq ft, with over 35 amenities overall.

Who It Is Meant For

The target buyer is a family wanting a big apartment a short drive from Manyata Tech Park. Layouts of 4 BHK and 3 BHK with a study or staff room dominate, and prices begin just under Rs. 3 Crore. People working in the Nagavara, Hebbal and Manyata office cluster who want a tall tower and a large clubhouse fit well.

The phases are far apart in progress. Little choice remains in Lodha Mirabelle Phase 1, which is well along and mostly sold. Lodha Mirabelle Phase 2 offers wider availability and a 2030 completion, which suits those willing to wait.

Address and Daily Travel

The registration places the project in KR Puram Hobli's Thanisandra village, along Thanisandra Main Road, pincode 560077. The public road borders the site to the south. The closest major office campus is Manyata Tech Park, and Nagavara borders the area.

Main routes from the gate:

  • Metro Pink Line and Blue Line, both being built, with Nagavara stations planned
  • Thanisandra Main Road, the access road, meeting the ORR at Nagavara
  • Bellary Road from Hebbal for the airport, roughly 30 minutes off-peak
  • The Outer Ring Road towards Hennur, Hebbal and KR Puram

Elements Mall is roughly 5 minutes away, while VIBGYOR School and Manipal Hospital take about 20 minutes. Peak-hour crowding on Thanisandra Main Road is common, so test a weekday commute if the office is not in Manyata. Until the metro opens, most trips will be by car.

Layouts and Carpet Areas

Phase 1 spans 2.5 BHK up to 4 BHK, and Phase 2 a 2 BHK with study up to 4 BHK. Registered carpet areas show the sizes most clearly:

  • 2.5 BHK (first phase): 876-1,032 sq ft, 61 units
  • 3 BHK (first phase): 996 sq ft, 28 units
  • 3.5 BHK (first phase): 1,224 sq ft, 167 units
  • 4 BHK (first phase): 1,451-1,512 sq ft, 87 units
  • 3 BHK and study (second phase): 1,308 sq ft, 117 units
  • 4 BHK (second phase): 1,694 sq ft, 150 units

A further 17 homes in Phase 2 are split across 3 BHK, 2 BHK plus study and plain 2 BHK. Price sheets quote saleable area, which is bigger because it counts walls, balconies and a slice of common space. Carpet area keeps comparisons honest between the phases and against other projects.

Registrations and Site Progress

Each phase has its own RERA number. "Mirabelle", the first phase, received PRM/KA/RERA/1251/309/PR/131023/006321 on 13 October 2023, and "Mirabelle Phase 2" received PRM/KA/RERA/1251/446/PR/230425/007688 on 23 April 2025.

G Corp Homes Private Limited is the promoter on both, while Lodha Group markets the homes. The sale agreement will therefore name the promoter company, which buyers should note. July 2026 quarterly filings reported:

  • Phase 1 at 82% overall, all three towers topped out and finishing in progress
  • 418 of 437 Phase 1 units booked
  • Phase 2 at 7%, foundations finished and casting begun on the first floors
  • 173 of 284 Phase 2 homes booked

Phase 1 remains under construction, with handover tied to the occupancy certificate. As for Phase 2, including its 39-floor tower, most of the frame is still to be built. In both phases, read the RERA quarterly filings ahead of every instalment.

Pricing and Extra Costs

Rs. 2.99 Crore buys an entry 3.5 BHK in Phase 1, and Rs. 3.49 Crore a 4 BHK. Over in Phase 2, the 3 BHK with study starts from Rs. 3.25 Crore, while a 4 BHK starts from Rs. 3.8 Crore. Phase 1 has few homes left, and floor and facing set each one's price, so request the current list.

Over and above the base price:

  • 5% GST on an under-construction purchase
  • Stamp duty, 5.6% with cess and surcharge for homes over Rs. 45 Lakhs
  • A 2% registration fee
  • Preferred location, floor rise and parking charges
  • Corpus fund, maintenance deposit and clubhouse fee

To illustrate, a Rs. 2.99 Crore home attracts roughly Rs. 6 Lakhs in registration and Rs. 16.7 Lakhs in stamp duty. Borrowing beyond Rs. 75 Lakhs requires 25% down, here Rs. 74.75 Lakhs, which leaves a loan near Rs. 2.24 Crore; over 20 years at 8.5% the EMI is roughly Rs. 1.95 Lakhs monthly. Other prices and terms can be tried on the EMI calculator.

Checklist Before Booking

With both registrations secured, the checks centre on phase, tower and the specific flat:

  1. Find out which registration applies to the flat and tower on offer, and search it on the state portal.
  2. Match that phase's newest quarterly filing against what a site visit shows.
  3. Get the saleable, balcony and carpet areas of the flat in writing.
  4. For a Tower 7 4 BHK, ask if a studio unit is attached and the way it is registered.
  5. Check the agreement's delay interest, grace period and handover date.
  6. Have a lawyer go through the khata, title papers and development agreement.
  7. Ask which facilities, the clubhouse included, are linked to Phase 1 and which to Phase 2.
  8. Check bank approvals for the phase, and hold a sanction letter ahead of the booking payment.

Keep every reply on paper. First-phase buyers should ask when an occupancy certificate is likely, and second-phase buyers should tie each instalment to visible progress on site.

Frequently Asked Questions

Does Lodha Mirabelle have RERA registration?+
Yes, one per phase. Phase 1 received PRM/KA/RERA/1251/309/PR/131023/006321 on 13 October 2023, and Phase 2 received PRM/KA/RERA/1251/446/PR/230425/007688 on 23 April 2025. The state portal shows both.
What is the address of Lodha Mirabelle?+
Thanisandra village, North Bangalore 560077, along Thanisandra Main Road. It neighbours Manyata Tech Park as well as Nagavara.
When will Lodha Mirabelle be handed over?+
Towers 5, 6 and 7, forming Phase 1, are due by 30 June 2028. Towers 3 and 4, forming Phase 2, are due by 31 May 2030. The July 2026 update put Phase 1 at 82%.
How much do homes at Lodha Mirabelle cost?+
Rs. 2.99 Crore buys an entry 3.5 BHK in Phase 1, and Rs. 3.25 Crore a Phase 2 3 BHK with study. Request the current list for exact figures.
How many towers are in Lodha Mirabelle?+
Five carry the Mirabelle name. The three Phase 1 towers rise 28 floors apiece, while Phase 2 pairs Tower 3 (30 floors) with Tower 4 (39 floors).

Related Reads

Call