Shriram 107 SouthEast, Attibele: Phase 3 Buyer's Guide (October 2026)

Off Hosur Road at Bangalore's southern edge, Shriram Properties is building Shriram 107 SouthEast in Manchenahalli, a village by Attibele. The project spans three phases and 2,397 homes, and Phase 3 sells flats of 2 and 3 BHK priced upward of Rs. 56.7 Lakhs. Below are the location, homes, prices and costs, RERA status for each phase and what to settle before booking.
Project Basics
The developer is Shriram Properties, and the registrations name Shriprop Living Space Private Limited the promoter. The land measures 18 acres 5 guntas, advertised as 19 acres, and the postal address is Manchenahalli Village in Attibele Hobli of Anekal Taluk, Bengaluru Urban, PIN 562107. Phase 1 holds seven towers with 634 homes, Phase 2 six towers with 708, and Phase 3 nine 14-floor towers with 1,055.
Location and Commute
Manchenahalli is near Attibele, close to the border with Tamil Nadu. The main road into the city is Hosur Road (National Highway 44), with Electronic City north-west along it, and the next town south is Hosur.
The Namma Metro Yellow Line, opened in August 2025, terminates at Bommasandra, and the rest of the trip to the project is by road. A further extension towards Hosur and Attibele has only been proposed, with no approved timeline.
At peak hours the highway fills with lorries and office traffic, while the toll plaza at Attibele lengthens the queue. The area has fewer schools, hospitals and big stores than older suburbs. Driving to work at normal office time is the most reliable test.
Who Should Look at It
The core audience is first-time buyers with a budget between Rs. 55 Lakhs and Rs. 75 Lakhs and a job in Hosur, Attibele, Bommasandra or Electronic City. Young couples and small families who prefer a brand-new home in a big community over an older resale home nearer the centre fit well. For a finished home, the earlier phases are available on resale.
Rooms are compact, which a family wanting large spaces will find limiting. From Attibele, jobs in the north or east of the city mean a very long commute. Close to 2,400 homes also make for a busy community, which suits some buyers and not others.
Phase 3 Homes
All three Phase 3 layouts carry the Smart label. Registered carpet area, saleable size and the number of each type are:
| Layout | Homes | Carpet | Saleable |
|---|---|---|---|
| 2 BHK Smart | 264 | 43 sq m (463 sq ft) | 698 sq ft |
| 2 BHK Smart | 264 | 46 sq m (495 sq ft) | 752 sq ft |
| 3 BHK Smart | 527 | 57 sq m (614 sq ft) | 914 sq ft |
In every layout, carpet area comes to about two-thirds of saleable area. That puts the 3 BHK's three bedrooms within roughly a typical 2 BHK's carpet area. Take a tape measure to the model flat to see whether the family's furniture will fit.
Each Phase 3 tower rises 14 floors over two basements, about eight homes to a floor. Parking adds up to one space per home, with 965 covered spots and 90 in the open. MIVAN formwork means the walls and slabs are concrete-cast.
Prices and Charges
The smaller 2 BHK, at 698 sq ft, is priced Rs. 56.7 Lakhs upward. The larger 2 BHK of 752 sq ft costs Rs. 59.9 Lakhs, and the 3 BHK is Rs. 71.8 Lakhs. Per sq ft, the smallest flat comes to near Rs. 8,100 and the 3 BHK to Rs. 7,900, while on carpet area the smallest works out around Rs. 12,200 a sq ft.
Plan for these charges over the base price:
- GST, since the home is bought under construction
- Stamp duty at 5%, which cess and surcharge raise to 5.6% on the registered value
- A 2% registration fee
- Clubhouse membership, floor rise charges, corpus fund and maintenance advance
- Charges for water and electricity connections
As an illustration, paying 20% down on the cheapest flat, priced Rs. 56.7 Lakhs, leaves a loan near Rs. 45.4 Lakhs. Over 20 years at 8.5% interest, the EMI is roughly Rs. 39,400 monthly, and the EMI calculator handles other sums and tenures.
RERA Phases and Status
Each phase has its own registration with Karnataka RERA:
- Phase 1, registered 22 November 2018 and given its occupancy certificate on 1 July 2024: PRM/KA/RERA/1251/308/PR/181122/002156
- Phase 2, registered 15 July 2019 with completion due 14 March 2025: PRM/KA/RERA/1251/308/PR/190715/002689
- Phase 3, registered 14 February 2022 with completion due 7 January 2027: PRM/KA/RERA/1251/308/PR/140222/004708
Phase 1 is finished and the Phase 2 date has passed, while Phase 3 is still being built toward its date in early January 2027. All three numbers can be verified via the Karnataka RERA portal.
The land is held through a joint development agreement, with the promoter and the landowners each owning part of the flats. Buyers should know which party is selling their chosen home. The sale agreement must carry the possession date and the Phase 3 registration number.
Before Paying the Booking Amount
With three phases, buyers must be clear about which tower and registration their home belongs to. Settle these points in writing first:
- Confirm the phase and tower number, and check the agreement's RERA number against that phase
- For a Phase 1 or Phase 2 home, ask to see the occupancy certificate
- Note the agreement's carpet area and compare carpet-area pricing with other projects
- Have the Phase 3 possession date and delay compensation written into the agreement
- Request a full cost sheet listing GST, deposits and floor rise separately
- Ask how water is sourced and how sewage is treated for so many homes
- Ask residents in occupied towers about lift waits and maintenance charges
- Find out which lenders have approved loans in the phase
All three phases share one clubhouse and the common areas. Ask which facilities already operate and which arrive with Phase 3, and visit on a weekend to see how crowded the shared spaces are.



