Ramky One Karnival, Electronic City Phase 1: Guide for Buyers (October 2026)

Nearly ready for handover, Ramky One Karnival is an apartment development from Ramky Estates in the first phase of Electronic City. It puts 503 homes in a pair of 14-storey towers across 7.17 acres, and its 2 and 3 BHK flats start near Rs. 82 Lakhs. Below are the main facts, the buyer fit, location, layouts, prices, RERA history, progress and what to verify first.
Main Facts
A quick summary of the project is given below, with detail in the later sections:
- Promoter: the Ramky Estates and Farms company
- Address: Maragondanahalli Village in Anekal Taluk, part of Electronic City Phase 1
- Site: 29,036 sq m, which equals 7.17 acres
- Buildings: two, each with a basement, ground level and 14 floors
- Flats: 503 in all, split as 349 two-bedroom and 154 three-bedroom
- Saleable sizes: 755 sq ft at the smallest, 1,470 sq ft at the largest
- RERA: approval dated 26 February 2020, with completion now due 30 December 2026
Who Will Like It
Staff working at Electronic City's technology parks who want a short commute are the main audience. The 2 BHK flats suit couples or small families buying a first home under Rs. 1 Crore, and the 3 BHK units give a family a third bedroom without jumping to a higher budget.
Handover being near, it also suits buyers who would rather skip years of construction. With 503 households, lifts, pool and parking are shared widely. Anyone wanting a smaller community, or a home above 1,470 sq ft in size, should look at other options in Electronic City.
Address and Getting Around
On record, the land is survey numbers 36 to 40 of Maragondanahalli Village (Anekal Taluk, in the Bengaluru Urban district), within the first phase of Electronic City, 560100. NH 44, better known as Hosur Road, and the elevated Electronic City expressway carry traffic to Silk Board and on into South Bangalore.
Namma Metro's Yellow Line, which links Bommasandra with RV Road, began service in August 2025 and covers Electronic City. At RV Road it meets the Green Line, opening up the rest of the network. NICE Road, reachable from Electronic City, is the way to Tumkur Road and Mysore Road.
Daily needs within the area include:
- Tech campuses of Biocon, Siemens, Wipro, Infosys, HCL, TCS and Tech Mahindra
- Schools including Treamis, Ebenezer, Vibgyor High and Delhi Public School
- Hospitals including Cloudnine, Narayana Hrudayalaya, Motherhood and Sparsh
- Hotels including Lemon Tree, Ibis and The Oterra
Office-hour traffic on Hosur Road is heavy, and the final approach uses internal roads. A rush-hour drive to your workplace is the best test of the commute.
Layouts and Space
Two-bedroom homes make up 349 of the 503 units and three-bedroom homes the remaining 154, all in two towers built as basement, ground and 14 floors. The layouts on offer are:
- 2 BHK in 755 sq ft, 1,035 sq ft, 1,055 sq ft, 1,105 sq ft or 1,235 sq ft plans
- 3 BHK in 1,275 sq ft, 1,355 sq ft, 1,420 sq ft or 1,470 sq ft plans
RERA lists carpet areas of roughly 520 sq ft up to 804 sq ft in two-bedroom units, and 840 sq ft up to 974 sq ft in three-bedroom units. Each sale agreement records the carpet area, and that is the number to use when comparing projects.
Buildings occupy 4,115 sq m of a 29,036 sq m plot, so around 86% of the ground stays open. At 503 homes over 7.17 acres, density comes to about 70 homes an acre.
Pricing and Charges
Entry is a 1,105 sq ft 2 BHK near Rs. 82 Lakhs, then a 1,355 sq ft 3 BHK near Rs. 99.4 Lakhs, with the bigger 3 BHK units going as high as roughly Rs. 1.03 Crore. Per saleable sq ft, the rate is roughly Rs. 7,300 at the low end and Rs. 7,400 at the top.
Floor, facing and parking change the final number, so request our current price list and a cost sheet for the specific flat. It should show base price, floor rise, maintenance deposit and any GST that applies.
Statutory charges are extra. Karnataka levies 5% stamp duty on homes above Rs. 45 Lakhs, 5.6% once cess and surcharge are added, along with 2% registration. For an Rs. 82 Lakhs flat, the duty works out to Rs. 4,59,200, and registration to Rs. 1,64,000.
By way of illustration, paying 20% down on Rs. 82 Lakhs leaves Rs. 65.6 Lakhs to borrow. Over 20 years at 8.5%, the monthly EMI is near Rs. 56,930, and our EMI calculator runs other prices, rates and terms.
RERA History and Progress
The registration, PRM/KA/RERA/1251/308/PR/200226/003306, dates from 26 February 2020 and is held by the Ramky Estates and Farms company. Plans were sanctioned by the Bangalore Development Authority, and the number can be verified on the state RERA portal.
Work began in March 2020 against an original deadline of 31 March 2025. The Covid extension pushed that to 31 December 2025, and a further extension granted on 18 March 2026 moved it to 30 December 2026.
In the quarterly filing of July 2026, overall progress is 97%: Building B at 97% and Building A fully done at 100%. Since a partial occupancy certificate has been issued, homes are being handed over in phases.
That filing also shows 389 of 503 flats booked and 114 unsold, 91 of them in Building B. Two buyer complaints appear on the record, one seeking compensation for delay.
Facilities
Inside the clubhouse are an AC gym and a hall for many uses, while outdoor features fill the open space between the towers. They are:
- A swimming pool
- A tennis court plus a half basketball court
- A mini soccer pitch
- A jogging track
- An outdoor gym
- Table tennis
Checks Before You Pay
At handover stage, the flat, view, lifts and clubhouse can all be inspected, so a visit settles most doubts. Look into these before a booking amount:
- Occupancy: find out what the partial certificate covers, by building and floor, and if your flat falls within it.
- Possession: for Building B, have the handover date written into the sale agreement.
- Seller: a joint development agreement governs the land, so check whether the developer or a landowner owns the flat.
- Carpet area: compare the agreement's figure with what RERA shows for that unit.
- Payments: pay only into the project account listed with RERA.
- Loan: confirm your bank has cleared both the project and that particular building.
- Khata and tax: ask about the flat's e-khata status and when registration is expected.
For comparison, our listings of flats on sale across Electronic City cover the wider area. The Ramky Estates page lists the developer's other projects.