MJR Divine Meadows Phase 2, Sarjapur: Villa Buyer's Guide (October 2026)

Max Global Developers launched MJR Divine Meadows Phase 2 in September 2026, a gated community of 79 villas on roughly 6.84 acres at Mahalchowdenahalli village near Sarjapur town. It received its Karnataka RERA registration on 23 September 2026. What follows covers where it is, the villa sizes, approvals, schedule, costs and the paperwork to review before booking.
The Project on Paper
A summary of what RERA holds for this phase:
| Item | Detail |
|---|---|
| Developer | Max Global Developers, an HSR Layout partnership firm in Bangalore |
| Homes | 79 villas |
| Registered title | Divine Meadows Phase 2 |
| Land | Roughly 6.84 acres, or 27,670 square metres |
| Format | Villas of ground plus two floors |
| Configurations | 3 BHK, 4 BHK, 4.5 BHK, 5 BHK, 5.5 BHK |
| Usable floor space | Roughly 1,732 up to 4,602 square feet of carpet |
| Registered on | 23 September 2026 |
| Due for completion | 31 December 2031 |
Behind the MJR brand in Bangalore is Max Global Developers, and our MJR Builders listing collects its projects. This firm also holds the RERA records for Satori Residence by Genurise, North Park and Divine Meadows.
Where It Is
The land comprises Survey Nos. 95/8, 95/7, 95/6, 95/5, 95/2 and 94/2A of Mahalchowdenahalli Village in Anekal Taluk's Kasaba Hobli, Bengaluru Urban, PIN 562125. A road borders the site on its west. Next door is Phase 1, MJR Divine Meadows, with 137 villas on roughly 15.9 acres.
Mahalchowdenahalli is past Sarjapur town, further out than the Sarjapur Road office stretch. Schools, shops and everyday needs are in Sarjapur town, while tech parks on the Outer Ring Road take longer to reach. Driving the route to work at rush hour is the honest way to judge the commute.
Plans were sanctioned by STRRPA, the planning body for the Satellite Town Ring Road belt. That road is still under construction in stages around the city. Price the home on today's roads and treat the new road as a later bonus.
Villa Types and Carpet Areas
Five configurations are on offer, but 69 of the 79 homes are 4.5 BHK. Each villa is 9.9 metres tall over three levels, ground plus two. The approved mix:
- 69 homes in 4.5 BHK, carpet from 1,903 up to 3,469 square feet
- 5 homes in 5.5 BHK, carpet from 2,705 up to 4,602 square feet
- 2 homes in 5 BHK, carpet of 3,383 and 3,200 square feet
- 2 homes in 3 BHK, carpet of 1,757 and 1,732 square feet
- 1 home in 4 BHK, carpet close to 1,851 square feet
All figures are approximate. Carpet area is the usable floor within the walls, which is why these numbers look smaller than villa brochure figures. Verandahs and balconies are measured apart and add between 500 and 1,060 square feet per villa.
Within the 4.5 BHK type, the smallest home is just over half as big as the largest, so the villa number matters more than its label. Land shares for those villas range from roughly 1,960 up to 3,605 square feet. There are 154 parking spaces under cover plus 20 in the open, mostly two per villa, and the exact villa's floor, balcony and land figures should come from the RERA unit schedule.
Density, Open Space and Facilities
Spreading 79 villas over roughly 6.84 acres gives 11 to 12 villas per acre. The villas use 9,103 square metres, leaving 18,567 square metres open, close to 67% of the plot, with a floor area ratio of 0.8.
Phase 2 works on record include parks, an outdoor sports area, power backup, roads with footpaths, street lights and an STP. Water is drawn from borewells, backed by the gram panchayat's supply. The scope leaves out a clubhouse, gym and pool, so get written terms on whether this phase's owners will have access to the clubhouse in Phase 1.
Registration and Approvals
Karnataka RERA issued PRM/KA/RERA/1251/308/PR/230926/008967 on 23 September 2026, searchable on the portal as "Divine Meadows Phase 2". On 15 July 2026 the plan received sanction number STRRPA/TP/CC/593/2025-26/914.
Marketing says MJR, but the registration belongs to Max Global Developers, the promoter who must sign the sale agreement. Two landowners own the six survey numbers, held under one khata. Have a lawyer review the khata, conversion orders and joint development terms before paying anything.
Schedule and the Phase 1 Track Record
Work is due to begin on 30 September 2026, with completion registered for 31 December 2031, a wait of just over five years. The plan puts the structure in 2028 and 2029, with finishing works and landscaping spread over 2030 and 2031.
The clearest guide to how this developer delivers is the earlier phase. Its RERA date is 19 December 2022, and it was due for completion on 15 August 2026. An update on 2 September 2026 showed it 95% done, the structure complete, with clubhouse, amenity and finishing work still going on.
A walk through Phase 1 reveals the build quality, the roads and the handover pace. It is worth the trip before committing to a 2031 home.
Budgeting for a Villa
Launch prices are still being fixed by the developer, so request the current price list and a cost sheet. Compare villas on carpet area, because two homes of one type can differ a great deal. A proper sheet states the total payable, including:
- The base price, plus any premium for park-facing or corner villas
- GST, as the home is under construction
- Above Rs. 45 Lakhs, duty of 5%, which becomes 5.6% with cess and surcharge, and 2% registration
- Connection deposits for electricity, sewage and water
- Any corpus fund, advance maintenance or clubhouse fee
The EMI calculator gives a monthly figure for a 20-year loan at 8.5% a year after 20% down. It helps set a realistic budget early.
Paperwork Checklist
A home due in 2031 ties up money for years, so take time over the documents:
- Check the state portal for the RERA number and make sure 31 December 2031 is the completion date shown.
- Compare the registration with the number of villas and building height in the approved plan.
- Read the khata and the original conversion order for every survey number.
- Get the chosen villa's carpet, balcony and land share figures on paper.
- Tour Phase 1 and ask its owners how quality and handover timing worked out.
- Clarify access to a clubhouse and the monthly upkeep, split across just 79 owners.
- See that Max Global Developers is the party signing the agreement for sale.
The law limits any payment ahead of the sale agreement to 10% of the price. Tie every later instalment to a building stage that can be checked on site.