Keya Homes is now building Keya The Urban Forest in the Kasavanahalli pocket of East Bangalore, bounded by Hosa Road on one side and Sarjapur Road on the other. Below, buyers will find the setting, home sizes, prices, RERA details and construction progress as of October 2026. A list of project-specific checks follows at the end.
Quick Facts
An 8.15-acre site is planned to carry four towers, each rising 24 storeys over a ground level and a double basement. Together they would hold 727 apartments of two to four bedrooms. A summary:
- Developer: Keya Homes
- Address: Bangalore 560035, Kasavanahalli
- Plot: 8.15 acres, four towers, 727 homes in total
- Height: 2B + G + 24 floors
- Sizes: 1,351-2,610 sq ft across three home types
- Lowest ticket: Rs. 1.70 Crore
- K-RERA: PRM/KA/RERA/1251/310/PR/200525/007759, due by 31 December 2028
Registered on 20 May 2025, the current phase covers only Towers A and B, which hold 391 homes. The other towers must be registered separately before going on sale. Always match a flat's tower against the registration it falls under.
Layouts and Price List
Three home types come in five layouts, measured on built-up area. Starting prices are:
- The 2 BHK of 1,351 sq ft, starting Rs. 1.70 Crore
- The 3 BHK of 1,710 sq ft, starting Rs. 2.14 Crore
- The 3 BHK Grand of 1,910 sq ft, starting Rs. 2.39 Crore
- The 4 BHK of 2,387 sq ft, starting Rs. 3.0 Crore
- The 4 BHK Grand of 2,610 sq ft, starting Rs. 3.30 Crore
Within Towers A and B, 3 BHK units lead with 246, while 4 BHK units number 93 and 2 BHK units 52. Registered average carpet areas are about 880 sq ft (2 BHK), 1,160 sq ft (3 BHK) and 1,655 sq ft (4 BHK). Since RERA works on carpet area, make sure the agreement records it for your flat.
All 789 parking spaces in this phase are covered, with none in the open. The towers reach 74 metres, the BWSSB is listed as water supplier, and the city corporation cleared the plan in April 2025.
Across the range, pricing works out to roughly Rs. 12,600 a sq ft. Floor, view and parking all move the final number, so get a complete cost sheet before comparing options.
Taxes, Loan and EMI
On a flat costing Rs. 1.70 Crore, duty of 5.6% including cess and surcharge is roughly Rs. 9.52 Lakhs, while 2% registration adds Rs. 3.40 Lakhs. Being under construction, the flat also attracts GST.
By way of illustration, a loan beyond Rs. 75 Lakhs funds no more than 75% of the price. That flat therefore needs 25% down and borrowing near Rs. 1.27 Crore. Repaid over two decades (20 years) at 8.5% annually, the EMI is roughly Rs. 1.11 Lakhs monthly, and the EMI calculator tests other prices and tenures.
Getting There
Revenue records place the land in Varthur hobli's Kasavanahalli village, inside the municipal boundary. East of HSR Layout, Kasavanahalli opens onto Sarjapur Road to one side and onto Hosa Road to the other. For the Bellandur and Marathahalli tech parks, the closest link is the Sarjapur Road junction on the Outer Ring Road.
Going south, Hosa Road joins Hosur Road and the Namma Metro Yellow Line, which opened in August 2025 and has its own Hosa Road station en route to Electronic City. The Blue Line, now being built along the ORR, plans a stop at Iblur. A Sarjapur Road metro has only been proposed.
Inner roads, including Kasavanahalli Main Road, narrow at points and clog during office hours. The ring road looks close on a map, yet the peak-time drive is slower than that suggests. Drive to work from the site at 9 am before deciding.
Green Spaces and Facilities
Club Verde, the clubhouse, anchors the amenities with a pool, gym and sports courts nearby. The built footprint is below a tenth of the registered plot, and the open remainder includes the landscaped forest zone behind the project's name. Announced features:
- A pond holding 4 million litres of water
- Power from solar panels
- EV charging points
Large multi-tower projects tend to deliver facilities in phases. Read the agreement alongside the RERA filing to see which ones this phase includes and their due dates.
Registration and Progress
K-RERA lists the project as "The Urban Forest", promoted by Keya Homes. Construction got under way on 15 May 2025, with 31 December 2028 as the date on file. Although the developer aims for December 2027, delay compensation runs from the RERA date.
The newest quarterly update places work at foundations, basements and the early structure. The registration declares land and project litigation-free. Fire, electricity, water board and airport authority approvals are shown as received.
Through a joint development deal, 22.4% belongs to the land owner, so some flats come from that portion. Anyone buying one should check who the signatory is and confirm payment goes into the RERA-designated account.
Developer Background
Keya Homes, a Bangalore firm incorporated in 2013, has its office in Koramangala. Earlier projects on the RERA portal are Around The Life, Life By The Lake and The Green Terraces, and the first two are shown as completed. Touring one of them is an easy way to judge construction quality and maintenance.
Who It Is For
Families working in Electronic City, along Sarjapur Road or on the ORR's eastern side who want a big gated community are the main audience. Those needing three or four bedrooms get the most layout choice. Entry costs exceed Rs. 1.5 Crore, which rules out tighter budgets.
The registered possession date is over two years off, so households needing to move soon should look at finished buildings. With 8.15 acres carrying 727 homes, the community will be large and lively once all four towers fill up.
Checklist for This Project
Run through these points before booking:
- Verify that your flat and tower fall under the registration ending 007759.
- Compare price on the carpet area stated in the agreement.
- Get a written possession date, bearing in mind RERA shows 31 December 2028.
- Ask whether the flat comes from the land owner's portion or the developer's.
- Confirm which amenities, the clubhouse included, form part of the registered phase.
- Check for any storm water drain near the plot and the buffer the sanctioned plan provides.
- Do a peak-hour drive to the office via Kasavanahalli Main Road.